摘要
《建设工程工程量清单计价规范》(GB50500-2013)既借鉴国际惯例,有理论的前瞻性,又结合国内造价管理的实践,具有很强的操作性。为准确理解和掌握规范的精神实质和内涵要求,更好地发挥规范的指导作用,本文在剖析其体现的五项主要原则、解读其体现的六项技术要点的基础上,提出规范实践运用的三个关键问题,并为进一步改进和完善工程量清单计价规范提出合理化建议。
Code of Bills of Qucmfities and Valuation for Construction Works(GB50500-2013) embodies the prospec- tive of theory and has a very strong operability, because it references international practice and combines with the practice of cost management. In order to accurately understand and grasp the essence and connotation of the speci- fication, play better a guiding role norms, the paper deeply analyzes the five main standards reflected by the princi- ple, systematically explains six main technical points. Based on the perspective of praetice, the paper puts forward three key problems about the practice of specification on that basis. At last, the paper analyzes the limitations and puts fbrward reasonable suggestions in order to further improve and perfect the bills of quantities.
出处
《建筑经济》
北大核心
2013年第6期16-19,共4页
Construction Economy
关键词
工程量清单
主要原则
技术要点
风险分担
bills of quantities
general principle
technical point
risk sharing