期刊文献+

山东省某垃圾焚烧项目配套渗滤液处理工程实例 被引量:5

Leachate Treatment Project of a Waste Incineration Power Plant in Shandong Province
原文传递
导出
摘要 山东省某生活垃圾焚烧发电项目设计处理能力为日入炉垃圾2 000 t,并配套600m3/d规模的渗滤液处理设施,采用反应沉淀/厌氧/SBR/深度处理工艺,出水水质达到爯城镇污水处理厂污染物排放标准爲(GB 18918—2002)的一级A标准.介绍了该配套设施的概况、工艺流程、构筑物设计和设备配置情况,并对调试过程及经验进行了总结. The design capacity of a waste incineration power plant in Shandong Province was 2 000 t/d. A set of leachate treatment facilities with a capacity of 600 m^3/d were built, and the effluent quality met the first level A criteria specified in the Discharge Standard of Pollutants for Municipal Wastewater Treatment Plants (GB 18918-2002). The general situation of affiliated facilities, process flow, parame-ters of structures and equipment configuration were introduced. The commissioning process and experi-ence were summarized.
出处 《中国给水排水》 CAS CSCD 北大核心 2013年第10期72-75,共4页 China Water & Wastewater
关键词 垃圾焚烧渗滤液 预处理 UBF SBR工艺 深度处理 waste incineration leachate pretreatment UBF SBR process advancedtreatment
  • 相关文献

参考文献3

二级参考文献7

共引文献87

同被引文献13

引证文献5

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部