摘要
耙吸式挖泥船溢流施工作为疏浚施工重要的方法之一,其施工效率的提高与装舱时间有关。确定最佳装舱时间及生产模式,需要对施工区土质、装舱时间、装舱效率、施工区域漂流出的土方量等要素进行分析计算,并加以工程实践验证。依据确定的最佳装舱时间组织生产施工,可以提高施工效率和经济效益。
The overflow construction of the trailing hopper suction dredger is one of the important methods of construction, and the improvement of construction efficiency relates to the loading time. To determine the best loading time and production mode, we need to analyze the soil in the construction area, loading time, loading efficiency, drifting soil from the construction area, etc., and verify them by the engineering practice. The best loading time guarantees the construction efficiency and economic benefits.
出处
《水运工程》
北大核心
2013年第4期184-186,共3页
Port & Waterway Engineering
关键词
耙吸
挖泥船
装载时间
施工效率
trailing suction
dredger
loading time
construction efficiency