基于关键链技术的项目鲁棒性优化调度方法研究 被引量:3

Robustness of Project Scheduling Research Based on Critical Chain Technique
下载PDF
导出
摘要 通过分析不同的缓冲计算方法的优劣,并以鲁棒性最大作为选择最佳缓冲的依据。希望为项目调度管理提供一个研究方向,对关键链和鲁棒性度量在项目管理上的应用起到积极的推动作用。 Critical chain technique and robustness measurement are new management technology ideas these years in project schedule fields, and the Buffer size is the core of critical chain technique. The paper analyzes the methods of buffer size calculating and chooses the maximum robustness for the best choice. In order to give a research direction about project schedule management, it is thought to have the promotion to chain technique and robustness measurement in project management.
出处 《科技管理研究》 CSSCI 北大核心 2013年第6期217-220,共4页 Science and Technology Management Research
基金 陕西省自然科学基础研究项目(2011JQ9001) 西北工业大学管理振兴与人文社科基金项目(RW201005)
关键词 关键链 缓冲尺寸 鲁棒性度量 项目调度 critical chain buffer size robustness measurement project scheduling
  • 相关文献

参考文献16

  • 1GOLDRATT E M. Critical Chain [ M ]. Great Barrington : The North River Press, 1997. 被引量:1
  • 2HERRNAN S. An investigation into the fundamentals of critical chain project scheduling [ J ]. intemational Journal of Project Management,2001, 19 (6): 363-369. 被引量:1
  • 3STEYN H. Project management application of the theory of the con- straints beyond critical chain scheduling [ J ]. International Joumai of Project Management, 2002, 20 ( 1 ) : 75 - 80. 被引量:1
  • 4BEVILACQUA M, Ciarapica F E, Giacchetta G. Critical Chain and risk analysis applied to high - risk industry maintenance: a case study [J]. International Journal of Project Management. 2009, 27 ( 4 ) : 419 -432. 被引量:1
  • 5WATSON K J, BLACKSTONEI J H, Gardiner S C. The evolution of a management philosophy: The Theory of Constraints [ J ]. Journal of Ooerations Management. 2007, 25 (2): 387-402. 被引量:1
  • 6赵道致,廖华.对关键链法的几个认识误区[J].工业工程,2005,8(2):4-6. 被引量:24
  • 7赵道致,廖华,刘一骝.关键链法:一种新型的项目进度计划方法[J].天津理工大学学报,2005,21(2):8-12. 被引量:32
  • 8胡信步.基于关键链法资源约束型多项目进度问题研究[D].中国.陕西.西安:西安交通大学,2006,05. 被引量:2
  • 9AL - FAWZANA M A, HAOUARI M. A bi - objective model for ro- bust resource- constrained project scheduling [ J ]. International Journal of Production Economics, 2005, 96 (2) : 175 - 187. 被引量:1
  • 10VONDER S V, DEMEULEMEESTER E, HERROELEN W, et al. The Use of Buffeers in Project Management : the trade - off Between Stability and Makespan [ J ]. Intematianal Jouranl of Production Eco- nomics, 2005, 97 (2) : 227 - 240. 被引量:1

二级参考文献52

共引文献158

同被引文献35

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部