摘要
结合国产实业(湖南)项目厚回填土地基处理,针对该场地地质条件、施工期条件等,对两种地基加固方案GFG桩和强夯置换法进行了分析、优选,介绍了了强夯置换法的施工工艺,进行了强夯置换法测试试验,结果表明,在该项目中采用强夯置换法作为填土基础处理方案是正确可行的。
Combined with fill-inground foundation treatment of Goldsun Group(Hunan)Project, aiming at the geological conditions and construction period, two base reinforcement schemes GFG pile and Dynamic compaction replacement method were analysed and contrasted, and the construction technology of the latter was introduced in detail. Testing results show that it is correct and feasible to adopt dynamic compaction replaccmenl method in this project.
出处
《水泥工程》
CAS
2013年第1期85-89,共5页
Cement Engineering
关键词
回填土
强夯置换
方案优选
检测
评价
back filling
dynamic compaclion replacement method
scheme preference
testing
evaluate