期刊文献+

基于ECDD技术的工程项目管理指标赋权新方法 被引量:4

A new method based on ECDD technique to determine index weight in engineering project management
下载PDF
导出
摘要 指标的赋权已成为影响工程项目管理(EPM)效果的重要因素。为了提升EPM的水平,针对现有指标赋权法所存在的问题,结合EPM的特点及其实际需求,本文提出了基于差异度排比(ECDD)技术的指标赋权法。该方法以属性重要量理论和差异度理论为基础,通过广义Likert量表获取所需的信息和数据后,针对任意指标的重要量和指标向量间的差异度,分别采用级权和值法以及离差附级和值法加以确定;然后利用差异度排比技术进行指标的判别和约简;在此基础上,计算并得到各个指标的权重。研究结果表明,该方法不仅能够充实和完善EPM理论,而且能够有效解决EPM指标的赋权问题,且具有很强的普适性。因此,该方法具有重要的理论价值和深远的现实意义。 The present methods to determine the index weight have some shortcomings when applied to Engineering Project Management (EPM). In view of this, combining features and demands of EPM, a new method to determine the index weight is presented. The method is based on Attribute Importance Degree and Difference Degree theories. After the data and information needed is ob- tained through generalized Likert Scale, the importance and difference can be figured out by the in- tegration of numerical value with weight and the summation of dispersion with grade, respectively; indexes can be judged and eliminated through the technique of Exclude & Compare Difference De- gree (ECDD). Based on these, the index weight can be calculated. In addition, the research re- suits show that the new method not only enriches EPM theory, but also resolves the problem to deter- mine the index weight in EPM effectively. The new method can be applied to other areas. There- fore, the method has theoretical value and reality significance.
出处 《广西大学学报(自然科学版)》 CAS 北大核心 2013年第1期208-214,共7页 Journal of Guangxi University(Natural Science Edition)
基金 国家自然科学基金资助项目(71171081) 教育部新世纪优秀人才支持计划项目(NCET-11-0633)
关键词 工程项目管理(EPM) 指标赋权法 Likert量表 差异度 重要度 engineering project management(EPM) the method to determine index weight Likertscale difference importance
  • 相关文献

参考文献9

二级参考文献25

共引文献21

同被引文献31

  • 1刘学方,王重鸣,唐宁玉,朱健,倪宁.家族企业接班人胜任力建模——一个实证研究[J].管理世界,2006,22(5):96-106. 被引量:82
  • 2李文东,时勘,吴红岩,贾娟,杨敏.任职者任务绩效水平对其工作分析评价结果的影响——来自电厂设计人员和编辑的证据[J].心理学报,2006,38(3):428-435. 被引量:12
  • 3MCCLELLAND D C. Testing for competence rather than for" intelligence. " [ J]. American psychologist, 1973, 28 ( 1 ) : 1-14. 被引量:1
  • 4SHIPPMANN J S, ASH R A, BATJTSTA M, et al. The practice of competency modeling [ J 7- Personnel Psychology, 2000, 53(3): 703-740. 被引量:1
  • 5SANCHEZ J I, LEVINE E L. What is (or should be) the difference between competency modeling and traditional job analysis[ J]. Human Resource Management Review, 2009, 19(2) : 53-63. 被引量:1
  • 6PETERSON N G, MUMFORD M D, BORMAN W C, et al. Understanding work using the occupational information net- work (O * NET) : Implications for practice and research[ J]. Personnel Psychology, 2001,54(2) : 451-492. 被引量:1
  • 7TAYLOR P J, LI W D, SHI K, et al. The transportability of job information across countries [ J ]. Personnel Psychology, 2008, 61(1) : 69-111. 被引量:1
  • 8ODUSAMI K T. Perceptions of construction professionals concerning important skills of effective project leaders[ J]. Jour- nal of Management in Engineering, 2002, 18 (2) : 61-67. 被引量:1
  • 9AHADZIE D K, PROVERBS D G, OLOMOLAIYE P O, et al. Competencies required by project managers for housing construction in Ghana: implications for CPD agenda[ J ]. Engineering, Construction and Architectural Management, 2009, 16(4) : 353-375. 被引量:1
  • 10DAINTY A R J, CHENG M I, MOORE D R. Competency-based model for predicting construction project managers' per- formance[ J]. Journal of Management in Engineering, 2005, 21(1): 2-9. 被引量:1

引证文献4

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部