福建水口水力发电厂单机容量 2 0 0MW水轮发电机组已投产六年。通过运行实践 ,本文对该水轮发电机组的推力轴承、水导轴承、主轴密封、转轮密封等主要结构进行了分析 ,仅供参考。
MW Hydroelectric Generating Units for Shuikou Power Station have put in to operation for six years.In this paper,the advantages for construction of thrust bearings,turbine guide bearings,main shaft seal,runner seal are analyzed.It is expected that the paper can provide references.
出处
《大电机技术》
北大核心
2000年第4期30-32,59,共4页
Large Electric Machine and Hydraulic Turbine
关键词
水轮发电机组
结构
轴承
水口电厂
main shaft seal
runner
turbine guide bearing
thrust bearing