摘要
结合具体工程实例,介绍了管桩复合地基加固在时速350 km/h的高速客运专线上的应用,研究结果表明:将预应力管桩进行创新处理,同时与钢筋混凝土板结合,既施工快捷,质量可靠,又能保证路基稳定。
This article especially combines with specific construction examples,it introduces the application of tubular pile composite foundation on the speed of 350 km/h high-speed passenger line.Research results that using of innovative processing on prestressed pipe pile which is combined with the reinforced concrete slab can realize rapid construction with reliable quality,but also to ensure the stability of the roadbed.
出处
《山西建筑》
2013年第4期146-148,共3页
Shanxi Architecture
关键词
预应力管桩
复合地基
高铁
prestressed pipe pile
composite foundation
high railway