摘要 利用WITNESS仿真方法对生产过程建模并测定其产品生产周期的波动,可以得到以下结论,前一计划期生产波动会引起后一计划期生产以更加明显的波动,并且波动会沿着计划期阶段之间传递,并证实任务提前投产非但不能够获得预期的效果,反而很有可能会使情况变的更加糟糕,这非常有助于以后的提前期的测度与控制工作研究的开展。 Using WITNESS simulation model of the production process, the paper determines the volatility of product cycle and concludes as follows: the fluctuation in the first phase will generate more obvious fluctuation in the second phase, and fluctuations progressively transfer in the following phases; early production tasks will not only fail to achieve the desired production effect , but also make the situation worse, and lead to the uncertainty of measurement and control of cycle fluctuations, which provides a new insight.
作者 鲁雷
出处 《科技管理研究》 CSSCI 北大核心 2012年第24期220-222,255,共4页 Science and Technology Management Research
基金 教育部人文社会科学研究规划基金项目"面向混流生产作业计划的约束理论控制方法研究"(08JA630033)
关键词 生产提前期 WITNESS仿真 牛鞭效应 测度研究 production lead time WITNESS simulation bullwhip effect measurement study
  • 相关文献

参考文献12

  • 1AZARON A, KATAGIRI H, KATO K, et al. Longest path analysis in networks of queues : dynamic scheduling problems [ J 1. European Journal of Operational Research, 2006, 174 ( 1 ) : 132 - 149. 被引量:1
  • 2AZARON A, KATAGIRI H, KATO K, et al. Modeling complex as- semblies as a queuing network for lead time control [ J ]. European Journal of Operational Research, 2006 (174) : 150 -168. 被引量:1
  • 3AMIR AZARON, FARHAD KIANFAR. A multi - objective lead time control problem in multistage assembly systems using an interactive method [ J]. Applied Mathematics and Computation, 2006, 176 (2) : 609 - 620. 被引量:1
  • 4AMIR AZARON, HIDEKI KATAGIRI, MASATOSHI SAKAWA. A multi - objective lead time control problem in multi - stage assembly systems using genetic algorithms [ J]. European Journal of Operational Research, 2007, 180 (1): 292-308. 被引量:1
  • 5TRUONG TON HIEN DUC, HUYNH TRUNG LUONG, YEONG- DAE KIM. A measure of the bullwhip effect in supply chains with sto- chastic lead time [ J]. Int J Adv Manuf Technol 2008 (38) : 1201 - 1212. 被引量:1
  • 6SOHERL ABGINEHCI-II, REZA ZANJIRANI FARAHAI. Modeling and analysis for determining optimal suppliers under stochastic lead times [ J ]. Applied Mathematical Modeling, 2010 ( 34 ) : 1311 - 1328. 被引量:1
  • 7FAT1H TtiYStiZ, CENGIZ KAHRAMAN. Modeling a flexible manu- facturing cell using stochastic Petri nets with fuzzy parameters [ J 3- Expert Systems with Applications, 2010 (37) : 3910 -3920. 被引量:1
  • 8BARBOSA V C, FERRE1RA F M L, et al. Structured construction and simulation of nondeterministic stochastic activity networks [ J ]. Eumoean Journal of Operational Research, 2009 (198) : 266 - 274. 被引量:1
  • 9韩文民,郭铜修.提前期牛鞭效应的产生与基于TOC的生产计划控制[J].系统工程,2005,23(12):59-62. 被引量:7
  • 10韩文民,袁丽丽,叶涛锋.基于随机Petri网的生产提前期牛鞭效应测度研究[J].中国管理科学,2011,19(2):116-124. 被引量:4

二级参考文献25

共引文献25

同被引文献4

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部