期刊文献+

地下连续墙施工影响应力重分布的数值模拟 被引量:25

Numerical simulation of stress redistribution during diaphragm wall construction
下载PDF
导出
摘要 对武汉市某超大型超深基坑10幅邻近地连墙跳跃式施工过程进行了三维有限差分数值模拟。数值模拟步骤依次为泥浆护壁成槽开挖、混凝土浇筑及混凝土硬化3个过程。泥浆护壁成槽开挖及混凝土浇筑分别采用常静液压力和变静液压力的方式加载,混凝土的硬化过程采用变弹性模量和泊松比的线弹性实体单元完成。数值计算结果与实测数据吻合较好。对单个跳跃式开挖过程墙上土压力的监测揭示了地下连续墙施工影响应力重分布的变化规律。模拟施工完成后10幅地下连续墙上的土压力值沿墙长度方向随静止土压力值上下波动,波谷出现在槽段连接处附近,波峰接近槽段中心轴,波动幅度大小与土体深度有关。分析表明,泥浆压力、混凝土灌注压力及土压力差值是影响墙后应力重分布波动幅度的主要原因,适当的泥浆重度及合理的注浆方式能避免土体扰动。 The construction of ten adjacent panels of a diaphragm wall of an ultra deep excavation in Wuhan city is simulated by a three-dimensional finite difference method.The construction procedure consists of the excavation supported by slurry,concrete pouring,and concrete hardening.The excavation is simulated by the constant distributed hydrostatic pressure while the concrete pouring process adopts variable distributed hydrostatic pressure.The concrete hardening process is finished by linear elastic solid elements with variable elasticity modulus and Poisson ratio.The results of the numerical computation show good agreement with the field test data.According to the process of single jumping excavation,the pressure monitoring reveals the influence of diaphragm wall construction on stress redistribution.The earth pressure fluctuates along the retaining wall after the construction completion of the ten panels.The peak value appears in the middle of the panel,while the trough value appears around the junction of two panels.The fluctuation range is related to the depth.The differences between slurry pressure,concrete pouring pressure and earth pressure are the main reason influencing the redistribution of earth pressure.Reasonable slurry unit weight and ideal concrete pouring method are suggested to avoid disturbance of soils.
出处 《岩土力学》 EI CAS CSCD 北大核心 2012年第11期3433-3438,共6页 Rock and Soil Mechanics
基金 教育部科学技术研究重点项目(No.109110)
关键词 地下连续墙 施工 应力重分布 数值模拟 现场实测 diaphragm wall construction stress redistribution numerical simulation field test
  • 相关文献

参考文献15

  • 1徐中华,王建华,王卫东.上海地区深基坑工程中地下连续墙的变形性状[J].土木工程学报,2008,41(8):81-86. 被引量:190
  • 2李彦东,梁发云,褚峰.软土地区深基坑变形特性三维数值模拟与验证[J].地下空间与工程学报,2011,7(6):1072-1077. 被引量:15
  • 3黄宏伟,黄栩,Schweiger F. Helmut.基坑开挖对下卧运营盾构隧道影响的数值模拟研究[J].土木工程学报,2012,45(3):182-189. 被引量:171
  • 4SCHAFER R,TRIANTAFYLLIDIS TH.Modelling ofearth and water pressure development during diaphragmwall construction in soft clay[J].International Journalfor Numerical and Analytical Methods inGeomechanics,2004,28(13):1305-1326. 被引量:1
  • 5SCHAFER R,TRIANTAFYLLIDIS TH.The influenceof the construction process on the deformation behaviourof diaphragm walls in soft clayed ground[J].International Journal for Numerical and AnalyticalMethods in Geomechanics,2006,30(7):563-576. 被引量:1
  • 6GUNN M J,CLAYTON C R I.Installation effects andtheir importance in the design of earth-retainingstructures[J].Geotechnique,1992,42(1):137-141. 被引量:1
  • 7MORTON K,CATER R W,LINNEY L.Observedsettlements of buildings adjacent to stations constructedfor the modified initial system of the mass transit railway,Hong Kong[C]//Proceedings of the 6th Southeast AsianConference on Soil Engineering.Taipei:[s.n.],1998:415-429. 被引量:1
  • 8POH T Y,WONG I H.Effects of construction ofdiaphragm wall panels on adjacent ground:Field trial[J].Journal of Geotechnical and GeoenviornmentalEngineering,1998,124(8):749-756. 被引量:1
  • 9POH T Y,GOH A T C,WONG I H.Ground movementsassociated with wall construction:Case histories[J].Journal of Geotechnical and GeoenviornmentalEngineering,2001,127(12):1061-1069. 被引量:1
  • 10THORLEY C B B,FORTH R A.Settlement due todiaphragm wall construction in reclaimed land in HongKong[J].Journal of Geotechnical and GeoenviornmentalEngineering,2011,128(6):473-478. 被引量:1

二级参考文献27