期刊文献+

Research and application of strip mining of village coal pillar at coal field of the north of the Yellow River in Shandong Province

Research and application of strip mining of village coal pillar at coal field of the north of the Yellow River in Shandong Province
下载PDF
导出
摘要 This paper focuses on the village coal pillar under huge thick loose bed and thin bedrock over high prelatic water level at the north of the Yellow River. The strip mining technology was used to protect the village houses. The stratum structure control action of mining subsidence was used to design the mining and pillar width. To further raise resources recovery, we adopted the mutative scheme of mining and pillar width. Observation was carried out while mining. Research shows there is feasibility of the strip mining technology to protecting the village buildings of the village coal pillar under huge thick loose bed and thin bedrock over high prelatic water level at the north of the Yellow River. Finally, subsidence parameters of strip mining were obtained. It is the basic data of the strip mining of the coal field at the north of the Yellow River.
出处 《Journal of Coal Science & Engineering(China)》 2012年第3期232-237,共6页 煤炭学报(英文版)
关键词 huge thick loose bed thin bedrock high prelatic water level strip mining coal field Yellow River 煤柱宽度 露天开采 村庄 黄河 煤场 条带开采技术 山东省 巨厚松散层
  • 相关文献

参考文献3

二级参考文献23

共引文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部