我国风电大规模集中并网的消纳市场和消纳策略 被引量:9

Consumption Market and Strategy of Large Scale Centralized Grid-Connection of Wind Power in China
原文传递
导出
摘要 近年我国风电规模高速增长,风电出力局部受限问题逐步凸现。根据规划,未来我国风电以大规模集中开发为主要形态,继续呈现快速增长势头。为保障风电的有效消纳,结合我国国情,开展了风电消纳市场及消纳策略研究。对比分析国内外风电消纳特征,根据我国风电发展条件及规划情况,重点研究不同风电消纳策略的差异及适用性,以调峰平衡为主要手段,研究未来我国风电的消纳市场及需求,并提出相关建议。 In recent years, the wind power installed capacity grows rapidly in China, but the wind power production restriction problems gradually emerge. According to the plan, the future main form of the wind power is large scale development in China, which continues to present the fast growth momentum. In order to guarantee the effective consumption of wind power, the consumption market and strategy of wind power was studied combining the national conditions of our country. The characteristics of domestic and foreign wind power consumption were compared, and focused on the differences and applicability of consumption strategies, according to China's wind power development and planning. Finally, this paper researched consumption market and demand of wind power in China with the method of cycling loading balance, and proposed some related suggestions.
出处 《电力建设》 2012年第10期9-12,共4页 Electric Power Construction
基金 国家电网公司大电网重大专项资助项目课题(SGCC-MPLG001-002-2012)
关键词 风电 集中并网 消纳市场 消纳策略 wind power centralized grid-connection consumption market consumption strategy
  • 相关文献

参考文献10

二级参考文献31

  • 1鲍爱霞.大规模风电场容量可信度的分析及对华东电网备用的影响[J].中国电机工程学报,2009,29(S1):34-38. 被引量:30
  • 2GORANSSON L, JOHNSSON F. Large scale integration of wind power moderating thermal power plant cycling[J]. Wind Engineering, 2010, 28(2): 1-15. 被引量:1
  • 3BILLINTON R, BAI G. Generating capacity adequacy associated with wind energy[J]. IEEE Trans on Energy Conversion, 2004, 19(3): 641-646. 被引量:1
  • 4da SILVA A M L, SALES W S, MANSO L A F. Long-term probabilistic evaluation of operating reserve requirements with renewable sources[J]. IEEE Trans on Power Systems, 2010, 25(1): 106-116. 被引量:1
  • 5BILLINTON R, GAO Y, KARKI R. Composite system adequacy assessment incorporating large-scale wind energy conversion systems considering wind speed correlation [J]. IEEE Trans on Power Systems, 2009, 24(3): 1375- 1382. 被引量:1
  • 6FORD A P, HARM W L. Market based adequacy: reliability and CBM/ATC calculations[C]// Proceedings of IEEE Power Engineering Society Winter Meeting, January 27-31, 2002, New York, NY, USA: 18-23. 被引量:1
  • 7KARKI R, HU P, BILLINTON R. A simplified wind power generation model for reliability evaluation[J]. IEEE Trans on Power Systems, 2006, 21(2): 533-540. 被引量:1
  • 8IEEE RTS Task Force of APM Subcommittee. IEEE reliability test system[J]. IEEE Trans on PAS, 1979, 98(6): 2047- 2054. 被引量:1
  • 9WWEA.The highlights of the world wind energy report 2010 [EB/OL].http://www.wwindea.org/home/index.php. 被引量:1
  • 10ABILDGAARD H.Experience of the Danish transmission system operator[EB/OL].http://www.iea.org/work/2007/grids/Abildgaard_ Energinet.pdf. 被引量:1

共引文献225

同被引文献113

引证文献9

二级引证文献135

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部