期刊文献+

制定燃气轮机检修周期的经验 被引量:5

Experience of Making the Gas Turbine Maintenance Schedule
下载PDF
导出
摘要 本文介绍了影响燃机检修周期的主要因素和制造厂家对燃机检修周期的推荐标准。根据深南电燃机运行检修经验,给出了热通道部件的主要失效形式和深南电9E燃机在重油工况下热通道部件安全运行最长时间,并在此基础上制定了燃机检修周期。 Main effect factors of gas turbine maintenance interval and the estimated maintenance interval criteria supplied by manufacturers are mentioned in this paper. Basing on the operation and maintenance experience of NSRD, failure mode and maintenance interval of hot gas path components in the heavy oil condition are introduced. Accordingly, the maintenance schedule of gas turbine is given.
作者 曾志
出处 《燃气轮机技术》 2012年第3期68-72,共5页 Gas Turbine Technology
关键词 燃机 检修周期 热通道部件 gas turbine maintenance interval hot gas path components
  • 相关文献

参考文献5

  • 1Second And Third Stage Nozzle Creep Deflection, Inspection And Measurement Criteria ( TIL - 1151 - 3 ). GE Power Systems. 被引量:1
  • 2Schilke P W. Advanced Gas Turbine Materials and Coatings ( GER -3569G). GE Power Systems. 被引量:1
  • 3Viswanathan V. Blade Life Management Coating Systems[ R]. TR -113599, EPRI Interim Report. 被引量:1
  • 4陈国良..高温合金学[M],1988.
  • 5Balevie D, Burger R, David Forty D. Heavy Duty Gas Turbine Operating and Maintenance Considerations (GER -3620K). GE Power Systems. 被引量:1

同被引文献19

引证文献5

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部