液压钢模台车整浇暗渠管身施工技术 被引量:6

Construction Technology for Underground Tunnel Tubes Casting with Hydraulic Steel Car
下载PDF
导出
摘要 南水北调中线一期新乡段的峪河暗渠修筑,有着地质条件复杂、工期紧、穿越施工难度大、质量要求高等特点,如何按照预定的工期,建造出高质量的建筑产品,在实践中探索和创新了液压钢模台车整浇暗渠管身施工技术,取得了成功的经验。结果表明,采用本施工技术,既能保证施工安全、质量,又能加快施工进度。 The Phase One South-to-North Water Transfer project passed Yuhe of Xinxiang using underground tunnels and the construction was featured by complex geological condition, short construction period , difficult crossing construction and high quality requirement. It is difficult to finish this project with high quality while meeting the preset construction deadline. By practice, a new technology was developed to do the solid casting of the tunnel pipes using the self-developed hydraulic steel car. This technology not only meets the construction safety and quality requirements, but also enhances the construction speed.
出处 《施工技术》 CAS 北大核心 2012年第8期106-109,共4页 Construction Technology
关键词 液压钢模台车 结构设计 制作 安装 调试 整浇暗渠管身 施工技术 hydraulic steel car structural design prefabrication installation debugging solid casting of underground tunnel pipe construction
  • 相关文献

参考文献6

共引文献14

同被引文献33

引证文献6

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部