赢得值法在电网工程项目施工管理中的应用 被引量:8

Application of Earned Value Management in Power Grid Project Construction
原文传递
导出
摘要 赢得值法作为一种先进的管理方法,已普遍应用于项目进度、成本控制中。以电力施工企业某变电站土建工程为例,详细介绍赢得值法的使用,并探索其在应用中的缺陷及对策分析,通过主要参数对比,及时发现解决问题,促进工程施工费用与进度的统一。 Earned Value Management ( EVM ), an advanced management method, has been widely applied in the project scheduling and cost control. This paper has elaborated on the application of EVM and explored its application deficiencies and countermeasures based on the case study of the civil work of a transformer substation in a power construction enterprise. By comparing the main parameters, the problems and the solutions are to be found out in order to promote the harmony between construction cost and orogress.
作者 李焱 刘士李
出处 《华东电力》 北大核心 2012年第7期1270-1272,共3页 East China Electric Power
关键词 费用与进度统一 赢得值法 变电站 建筑工程 the harmony between cost and progress Earned Value Management (EVM) transformer substation construction engineering
  • 相关文献

同被引文献16

引证文献8

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部