5Mojtaba Rafieian.Impacts of temporary housing on housing reconstruction after the Bam earthquake[J].Disaster Prevention and Management,2013,22(1):63-74. 被引量:1
6Limongelli M P.Optimal location of sensors for reconstruction of seismic responses through spline function interpolation[J].Earthquake engineering and structural dynamics,2003,32(7): 1055-1074. 被引量:1
7Xu J P,Yi Lu.A comparative study on the national counterpart aid model for post disaster recovery-and reconstruction 2008 Wenchuan earthquake as a case[J].Disaster Prevention and Management,2013(1):75-93. 被引量:1