摘要 云南省龙陵至腾冲二级公路上的龙腾大桥,采用变连续刚构桥方案,桥跨布置为58m+102.25m+63m,其桥址位于八度地震区,需要进行抗震设计;依据抗震准则的设计目标,进行了地震作用下的抗震分析,包括自振特性分析,反应谱分析和动态时程分析;并以此为合理的结构抗震设计提供明确的依据。 The construction of Longteng Bridge on the second-rank road between Longling and Tengchong in Yunnan Province used pre-stress concrete continuous box girder layout, the span of this bridge is 58m + 102.25m +63m, the bridge construction site is located in eight degree seismic area, as a result, the design of the bridge should consider earthquake-resistance. Based on design objective of earthquake-resistance principle, earthquake- resistance analysis under the action of earthquake is conducted including natural vibration characteristics analysis, response spectrum analysis and dynamic time-history analysis, which provides the clear basis for reasonable structure earthquake-resistance design.
作者 鄢波 张梦龙
出处 《重庆工商大学学报(自然科学版)》 2012年第8期74-78,共5页 Journal of Chongqing Technology and Business University:Natural Science Edition
关键词 底板水平布置 连续刚构 抗震分析 bottom plate level layout continuous rigid frame earthquake-resistance analysis
  • 相关文献

参考文献6

二级参考文献14

  • 1魏乐永,沈旭东,肖汝诚,谭红梅.预应力混凝土连续箱梁底板崩裂破坏的机理及其对策[J].结构工程师,2007,23(2):53-57. 被引量:34
  • 2PODOLNY W J. The Cause of Cracking in Post Tensioned Concrete Box Girder Bridges and Retrofit Procedures[J].PCI Journal, 1985,30(2) :82-139. 被引量:1
  • 3CHATELAIN J, GODART B, DUCHENE J L. Detection, Diagnosis, and Monitoring of Cracked Pres tressed Concrete Bridges [C]//NOWAD A S. Proceedings of the NATO Advanced Research Workshop on Bridge Evaluation,Repair and Rehabilitation. Dordrecht : Kluwer Academic Publishers, 1990 : 145-159. 被引量:1
  • 4MOON D Y,SIM J, OH H. Practical Crack Control During the Construction of Precast Segmental Box Girder Bridges[J]. Computers & Structures, 2005,83 (31/32) :2584-2593. 被引量:1
  • 5浙江大学,浙江省公路管理局.预应力混凝土连续箱梁底板开裂原因分析及防治研究报告[R].杭州:浙江大学,2009. 被引量:3
  • 6HOGNESTAD E, HONSON N W, MCHENRY D. Concrete Stress Distribution in Ultimate Strength De sign[J].ACI Journal Proceedings, 1955,52 (12) : 455- 480. 被引量:1
  • 7AL-MANASEER A A, PHILLIPS D V. Numerical Study of Some Post-cracking Material Parameters Affecting Nonlinear Solutions in RC Deep Beams[J]. Canadian Journal of Civil Engineering, 1987,14 (5) : 655-666. 被引量:1
  • 8胡步毛.高墩大跨连续刚构桥地震反应分析[D].四川:西南交通大学桥梁与隧道工程系,2005. 被引量:1
  • 9JTGD62-2004.公路钢筋混凝土及预应力混凝土桥涵设计规范[S].[S].,.. 被引量:1844
  • 10徐有邻,程志军,杨建军,等.混凝土筒芯楼板受剪承载力试验研究[C]∥全国现浇混凝土空心楼盖结构技术交流会论文集.2005:106-112. 被引量:7

共引文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部