5Kirkpatrick S, Gelatt C D Jr, Vecchi M P. Optimization by simulated annealing[ J]. Science, 1983,220:671-680. 被引量:1
6Kirkpatrick S, Gelatt C D, Vecchi M P. Optimization by simu- lated annealing[ J ]. Science, 1983,220:671-680. 被引量:1
7KHISTY,JOTIN,JOHNSON. Traffic analysis of Chicago river and lock[J].Transp,1552,(02):94-101. 被引量:1
8NEIL S M. A survey of waterway capacity and policy is-sues[J].Marine Board Seminar on Waterway and Har-bor Capacity,2001,(06):152-157. 被引量:1
9Martinelli D, Schonfeld P. Approximating delays at interdependent locks[ J]. Journal of waterway, port, coastal, and ocean engineering, 1995,121 ( 6 ) :300 - 307. 被引量:1
10Ting C J, Schonfeld P. Control alternatives at a waterway lock [ J ]. Journal of waterway, port, coastal, and ocean engineering,2001,127 (2) :89 -96. 被引量:1