摘要
随着人们对建筑工程质量要求的不断提高和维权意识的增强,更加要求我们施工更加优良的工程,而后浇带处施工质量通病仍难以消除,因此,我们总结施工经验,查阅相关资料,经过几个工程的实践,总结出了一套技术先进,简便易操作,经济效益良好的梁板后浇带预先加固体系支模方法。
Along with constant improvement of requirements to the construction engineering quality and enhancement of rights consciousness from people, it requires to construction the more excellent engineering. But the quality problem of late poured bands is hard to eliminate. Therefore, we summarize the experience of construction and consult the relevant information. We summarize a after pouring belt of beam-slab formwork method with pre-reinforcement system, which has advanced technology and good economic benefits and be easy to operate, after several engineering practice.
出处
《中国住宅设施》
2012年第4期62-64,共3页
China Housing Facilities
关键词
后浇带
模板
预先加固体系
拆模强度
节约模板
简便易操作
late poured bands, Mouldboard, Pre-reinforcement system, Form removal strength, Save the mouldboard, Easy to operate