梁板后浇带预先加固体系支模方法 被引量:1

Formwork erecting method of the reinforcing system of beam-plate late poured bands
下载PDF
导出
摘要 随着人们对建筑工程质量要求的不断提高和维权意识的增强,更加要求我们施工更加优良的工程,而后浇带处施工质量通病仍难以消除,因此,我们总结施工经验,查阅相关资料,经过几个工程的实践,总结出了一套技术先进,简便易操作,经济效益良好的梁板后浇带预先加固体系支模方法。 Along with constant improvement of requirements to the construction engineering quality and enhancement of rights consciousness from people, it requires to construction the more excellent engineering. But the quality problem of late poured bands is hard to eliminate. Therefore, we summarize the experience of construction and consult the relevant information. We summarize a after pouring belt of beam-slab formwork method with pre-reinforcement system, which has advanced technology and good economic benefits and be easy to operate, after several engineering practice.
出处 《中国住宅设施》 2012年第4期62-64,共3页 China Housing Facilities
关键词 后浇带 模板 预先加固体系 拆模强度 节约模板 简便易操作 late poured bands, Mouldboard, Pre-reinforcement system, Form removal strength, Save the mouldboard, Easy to operate
  • 相关文献

参考文献3

  • 1GB50204-2002.《混凝土结构工程施工质量验收规范》.[S].,.. 被引量:70
  • 2《建筑施工模板安全技术规范》(JGJl62.2008). 被引量:7
  • 3建筑施工手册(第四版). 被引量:25

共引文献98

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部