摘要
介绍了昆明首期工程项目对车钩及缓冲器的配置与能量吸收,论述了能量吸收元件的相关特性、能量吸收方案,并对车钩及缓冲器的能量吸收特性进行模拟计算,指出现有车钩及缓冲器系统的能量吸收性能优于项目要求。
The article introduces the configuration and energy absorption of the coupler and buffer in Kunming Metro project,and discusses the relevant features of the energy absorption components,the program of energy absorption,and the energy absorption characteristics of the coupler and buffer are simulated,and point out that the energy absorption capacity of the existing coupler and buffer is superior to the project requirements.
出处
《技术与市场》
2012年第5期32-33,35,共3页
Technology and Market
关键词
车钩
缓冲器
吸能
模拟计算
coupler
buffer
energy absorbing
simulation