摘要
介绍了国华三河发电厂石灰石-石膏湿法脱硫系统GGH自投运以来为防止结垢堵塞所进行的改造及采取的相关措施,以及最终通过技术改造后的运行效果和经验。
This paper introduced the improvement and measures to prevent scale and clog since operation of wet de- sulphurization of limestone gypsum GGH in Sanhe Power Plant,as well as the operation effects and experience after technical reform.
出处
《华北电力技术》
CAS
2012年第5期46-49,共4页
North China Electric Power