摘要
提出利用串接直流融冰方法,用以解决未安装直流融冰装置变电站出线的直流融冰,并利用此方法对贵州电网220kV及以上线路的串接直流融冰可行性进行分析、计算。
The method of using series connection DC ice -melting is proposed, which to solve DC ice -melting for the substation oI uninstalled DC melting ice device. The feasibility of tandem connection DC ice - melting for the Guizhou power grid 220kV and above transmission line are analyzed and calculated by this method.
出处
《贵州电力技术》
2012年第4期5-7,共3页
Guizhou Electric Power Technology
关键词
直流融冰
串接
可行性
DC ice- melting
series connection
feasibility