摘要 小关子水电站机组技术供水方式为蜗壳取水的自流减压供水。由于发电用水中含有较多的垃圾物,电站存在技术供水系统滤水器易堵塞的问题。在2009年3月至2010年3月期间,先后对电站全部4台机组实施了解决滤水器易堵塞问题的技术改造。改造后,滤水器没有发生过堵塞情况,改造取得了令人满意的效果,彻底解决了长时间困扰电站的滤水器易堵塞问题。改造方案为,在机组技术供水系统的蜗壳取水口处安装专门设计的取水口拦污罩取代原有的网状拦污栅。该改造方案具有改造费用低、易于实施、改造效果好的特点,可以推广应用于类似水电站,有较高的实用价值。 Cooling water of the units of Xiaoguanzi Hydropower Station is supplied from spiral case by gravity with pressure reduction. Due lots of trashes are available in water for power generation, the water strainer of the cooling water supply of the station is easily blocked. During March, 2009 -March, 2010, technical updating was carried out for solving the strainer blocking of 4 units of the station respectively. After this updating, the strainers have never been blocked and a satisfied effect is obtained. The issue of the strainer blockage which has haunted the station for a long time is solved completely. The updating scheme is that one trash inclosure specially designed is applied to replace the existing net-type transhrack at water intake in the spiral case for the cooling water supply system of the units. This updating scheme is with lower cost, easy implementation and good updating effect. It can be popularized for similar hydropower stations and is with higher practical value.
出处 《西北水电》 2012年第2期65-67,74,共4页 Northwest Hydropower
关键词 水电站机组 供水系统 滤水器 堵塞 蜗壳取水 拦污罩 技术改造 Units of hydropower station water supply system water strainer blockage water supplied from spiral case trash inclosure technical updating
  • 相关文献

参考文献4

二级参考文献5

  • 1陶建民,王兰.黄河大峡水电站技术供水系统改造技施设计报告[R].西安:西北勘测设计研究院,2008. 被引量:1
  • 2GB3216-89.离心泵、混流泵、轴流泵和旋涡泵试验方法[s].[S].,.. 被引量:6
  • 3DL/T5081-1997,水力发电厂自动化设计技术规范[S]. 被引量:14
  • 4DL/T5066-1996,水力发电厂水力机械辅助设备系统设计技术规定[S]. 被引量:8
  • 5刘竹溪泵站水锤及其防护[M]. 被引量:1

共引文献16

同被引文献22

引证文献8

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部