摘要
建筑工程项目能否在预定的时间内交付使用,直接关系到项目经济效益的发挥。在建筑工程项目管理中,进度控制是基本的管理目标之一。本文在阐明工程项目施工进度控制的含义及其特点的基础上,从人为因素、环境因素、资源因素、技术因素及其他因素等方面分析了工程项目施工进度控制的影响因素及其存在的问题,最后从多方面有针对性的提出了一系列对策措施和意见建议,使得本文具有一定的实践参考价值和方法论意义。
Can the proJect be delivered within the scheduled time, the economics of projects directly related to the play. In project management, schedule cona'ol is the basic management goals. In this paper, to clarify the control of the project construction schedule based on the meaning and characteristics, from the human factors, environmental factors, resource factors, technological factors and other factors, analysis of the project conslruction schedule conlrol factors and their problems, Finally, focus on a series of proposed countermeasures and opinions, making reference to this article has some practical value and methodology.
出处
《科教导刊》
2012年第9期211-212,共2页
The Guide Of Science & Education