摘要
从实践中摸索出山区地质条件下高层建筑地下室利用工程结构循序渐近由上而下挖土形成基坑混凝土挡土结构的施工方法,在施工过程中,不会危及相邻建筑及工程结构的安全,同时优化了梁柱节点,给施工带来方便。
The consturction method of forming concrete retaining wall in foundation pit step by step by excavating from top to bottom with the application of the structures for the basement of high rise building in the geology conditions of mountain areas. In the course of construction, it will not threaten the safety of structural buildings nearby while optimizing beam column panel and bringing convenience to construction.