黄河公伯峡水电站左岸泄洪洞混凝土施工结构缝及裂缝渗漏的处理 被引量:3

Treatment of crack seepage in concrete structural joints of spillway tunnel on the left bank of Gongboxia hydropower station
下载PDF
导出
摘要 分析黄河公伯峡水电站左岸泄洪洞混凝土施工结构缝渗漏及产生裂缝原因,对渗漏进行化灌处理,处理后的结构伸缩缝和裂缝均达到不渗漏的效果,施工质量满足设计要求。 The paper analyzes the crack seepage in concrete structural joints of the spillway tunnel on the left bank of Gongboxia hydropower station on the Yellow River and the causes of cracks. Chemical grouting was carried out against the seepage, and no leakage occurs in the structural expansion joints and cracks after treatment. The construction quality satisfies the design requirements.
作者 刘美华 高雄
出处 《西北水电》 2011年第6期50-52,共3页 Northwest Hydropower
关键词 泄洪洞 结构缝 裂缝 化学灌浆 公伯峡水电站 spillway tunnel structural joint crack chemical grouting Gongboxia hydropower station
  • 相关文献

参考文献3

  • 1《水利水电工程施工手册》编委会编..水利水电工程施工手册 第3卷 混凝土工程[M].北京:中国电力出版社,2002:849.
  • 2乔生祥主编..水工混凝土缺陷检测和处理[M].北京:中国水利水电出版社,1997:253.
  • 3DL/T5195-2004,水工隧洞设计规范[s].北京:中国电力出版社,2004. 被引量:8