期刊文献+

劳动密集型制造单元的配置与排序模型 被引量:2

Cell Formation for Labor-Intensive Manufacturing Systems with Operator Assignment Considered
下载PDF
导出
摘要 研究劳动力密集型制造单元的配置和排序问题,提出单元配置和人员分配的方法。分3阶段解决此问题:单元配置、人员分配和产品排序。单元配置阶段利用产品的相似性,为单元分配产品;人员分配阶段采用加工时间最长的工序优先分配人员的策略;产品排序阶段采用经典的Palmer启发式算法。通过实例来说明此模型。仿真结果显示:单元配置中,与不考虑启用单元惩罚相比,考虑启用单元的惩罚,使得优化解中启用单元减少。同时,在单元配置中,3阶段方法可以为管理者提供借鉴。 In the existing cell formation methods for cellular manufacturing systems, often it does not consider operator configuration and product sequencing. However, for labor-intensive manufacturing systems, it is vitally important to determine the number of operators for each workstation in a cell. In this paper, cell formation problem is studied for labor-intensive manufacturing systems with operator assignment and product sequencing being considered. After an integer programming model is formulated for the problem, a three-phase heuristic solution method is proposed. In the first phase, the products are assigned into machines such that machine cells are formed based on the product similarity. In the second phase, operators are assigned to workstations by using the longest processing time priority rule. In the third phase, Palmer heuristic algorithm is used to sequence the product types. An example is used to illustrate the application of the proposed method.
出处 《工业工程》 北大核心 2011年第6期27-30,共4页 Industrial Engineering Journal
基金 国家自然科学基金资助项目(70971026) 广东省自然科学基金资助项目(9151009001000045) 广东省普通高校人文社科重点研究基地建设项目(08jdxm63004)
关键词 单元配置 产品相似性 整数规划 启发式算法 cell formation product similarity integer programming heuristic
  • 相关文献

参考文献12

  • 1Russell R S, Huang P Y, Leu Y. A study of labor allocation strategies in cellular manufacturing [ J ]. Decision Sciences, 1991,22(3) :594-611. 被引量:1
  • 2Yano C, Rachamadugu R. Sequencing to minimize work overload in assembly lines with product options [ J ]. Management Science, 1991,37 (5) : 1-15. 被引量:1
  • 3Lee C, Vairaktarakis G L. Job sequencing in cellular layouts to minimize total manpower [ C ]. FL: University of Florida, Gainesville, 1993. 被引量:1
  • 4Wirth G T, Mahmoodi F , Mosier C T. An investigation of scheduling policies in a dual-constrained manufacturing cell [J]. Decision Sciences, 1993,24(4) :761-788. 被引量:1
  • 5Stier G A, Dagli C. Intra-cell manpower transfers and cell loading in labor-intensive manufacturing ceils [ J ]. Computers & Industrial Engineering, 2005,48:643-655. 被引量:1
  • 6Stier G A, Tummaluri R R. Multi-period operator assignment considering skills, learning and forgetting in labour-intensive cells [ J ]. International Journal of Production Research, 2008,46(2) :469-493. 被引量:1
  • 7Stier G A, Arikan F, Babayigit C. Bi-objective cell loading problem with non-zero setup times with fuzzy aspiration levels in labour-intensive manufacturing cells [ J ]. International Journal of Production Research, 2008,46(2) :371-404. 被引量:1
  • 8Stier G A, Arikan F, Babayigit C. Effects of different fuzzy operators on fuzzy bi-objective cell loading problem in laborintensive manufacturing cells [ J ]. Computers & Industrial Engineering ,2009,56:476-488. 被引量:1
  • 9Stier G A, Jeremy Cosner, Amanda Patten. Models for cell loading and product sequencing in labor-intensive cells [ J ]. Computers & Industrial Engineering, 2009,56:97-105. 被引量:1
  • 10Won Youkyung, Lee Kun Chang. Modified p-median ap proach for efficient GT cell formation [ J ]. Computers & In dustrial Engineering, 2004,46:495-510. 被引量:1

二级参考文献10

  • 1Miltenburg J.U-shaped production lines:a review of theory and practice[J].International Journal of Production Economics,2001,70 (3):201-214. 被引量:1
  • 2Gupta J N D,Kruger K,Lauff V,et al.Heuristics for hybrid flow shops with controllable processing times and assignable due dates[J].Computers & Operations Research,2002,29 (10):1417 -1439. 被引量:1
  • 3Daniels R L,Hua S Y,Webster S.Heuristics for parallel machine flexible resource scheduling problems with unspecified job assignment[J].Computers & Operations Research,1999,26 (2):143-155. 被引量:1
  • 4Olafsson S,Shi L.A method for scheduling in parallel manufacturing systems with flexible resources[J].IIE Transactions,2000,32(2):135 -146. 被引量:1
  • 5Alex J Ruiz T,Grisselle C.Scheduling with flexible resources in parallel workcenters to minimize maximum completion time[J].Computers & Operations Research,2007,34(1):48-69. 被引量:1
  • 6Alex J Ruiz T,Franeisco J L,Johnny C H.Scheduling uniform parallel machines subject to a secondary resource to minimize the numbor of tardy jobs[J].European Journal of Operational Research,2007,179 (2):302-315. 被引量:1
  • 7Bank J,Werner F.Heuristic algorithms for unrelated parallel machine scheduling with a common due date,release dates,and linear earliness/tardiness penalties[J].Mathematical and Computer Modeling,2001,33:363-383. 被引量:1
  • 8Martin F,Dirk,B.Single-machine scheduling for minimizing earliness and tardiness penalties by recta-heuristic approaches[J].Computers & Industrial Engineering,2003,44:307-323. 被引量:1
  • 9Liaw C F.A branch-and-bound algorithm for the single machine earliness and tardiness scheduling problem[J].Computers & Operations Research,1999,26 (7):679-693. 被引量:1
  • 10Nawaz M,Enacroe J E E,Han I.A heuristic algorithm for the m-machine,n-job flow-shop sequencing problem[J].The International Journal of Management Science,1983,11(1):91-95. 被引量:1

共引文献5

同被引文献25

  • 1LEAPAIROTE K. Policies for multi - skilled worker selection, assign- ment, and scheduling [ D]. The United States of America: Universi- ty of Wisconsin - Madison, 2003. 被引量:1
  • 2YANO C, RACHAMADUGU R. Sequencing to minimize work over- load in assembly lines with product options [ J ]. Management Sci- ence, 1991, 37 (5): 1-15. 被引量:1
  • 3LEE C, VAIRAKTARAKIS G L. Job sequencing in cellular layouts to minimize total manpower [ C ]. Research Report, University of Flori- da, Gainesville, FL, 1993: 93- 18. 被引量:1
  • 4WIRTH G T, MAHMOODI F, MOSIER C T. An investigation of scheduling policies in a dual - constrained manufacturing cell [ J ]. Decision Sciences, 1993, 24 (4) : 761 - 788. 被引量:1
  • 5SEN C G, CINAR G. Evaluation and pre - allocation of operators with multiple skills: A combined fuzzy AHP and max - min approach [J]. Expert Systems with Applications, 2010, 37:2043 - 2053. 被引量:1
  • 6SONG B L, WONG W K, FAN J T, et al. A recursive operator allocation approach for assembly line - balancing optimization problem with the consideration of operator efficiency [ J]. Computers & Indus- trial Engineering, 2006, 51 : 585 - 608. 被引量:1
  • 7SONG B L, WONG W K, FAN J, et al. Chan. An adjusted recursive operator allocation optimization algorithm for line balancing control [J] . IAENG International Journal of Applied Mathematics, 2007, 36 (1):25-30. 被引量:1
  • 8Sotirios G. Dimitriadis. Assembly line balancing and group working: A heuristic procedure for workers' groups operating on the same product and workstation[ J]. Computers & Operations Research, 2006 (33) :2757 - 2774. 被引量:1
  • 9Yiyo Kuo, Taho Yang. Optimization of mixed-skill multi-line operator allocation problem[J]. Computers & Industrial Engineering, 2007 (53) :386 - 393. 被引量:1
  • 10Stler, G. A. , & Tummaluri, R. R.. Multi-period operator assignment considering skills, learning and forgetting in la- bour-intensive cells [ J ]. International Journal of Production Research, 2008,46 ( 2 ) : 469 - 493. 被引量:1

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部