期刊文献+

带时间窗口的自动化混流生产线调度方法 被引量:6

Scheduling Algorithm for Automated Mixed Production Line with Time Window Constraint
下载PDF
导出
摘要 研究了一类带时间窗口的自动化混流生产线调度问题,其中包括工件排序和机器人搬运作业排序两类问题。在对问题进行系统分析的基础上,考虑处理时间窗口约束、机器人搬运能力约束和工作站能力约束,使用混合整数规划方法建立了此类问题的通用数学模型,并采用CPLEX软件求解模型,以印刷电路板电镀生产线为实例并通过随机算例验证该方法的有效性。 The scheduling problem for a class of automated mixed production line with time window constraint is discussed. For such a system, it should sequence both the jobs and the robot movements. Based on a systematic analysis, in considering time window constraint on job processing times, robot availability constraint, and resource capability constraint, the problem is formulated as a mixed integer programming model. Then, the commercial software CPLEX is used to solve it. Computational results on benchmark and randomly generated instances show that the proposed MIP approach is very efficient in scheduling the automated mixed production line.
出处 《工业工程》 北大核心 2011年第5期110-115,共6页 Industrial Engineering Journal
基金 国家自然科学基金资助项目(506050527 1071129) 教育部"新世纪优秀人才支持计划"(NCET-06-0875)
关键词 自动化混流生产线 周期性调度 混合整数规划 时间窗口 automated mixed production line cyclic scheduling mixed integer programming time window constraint
  • 相关文献

参考文献11

  • 1Dawande M, Geismar H N, Sethi S P, et al. Sequencing and scheduling in robotic cells : recent development [ J ]. Journal of Scheduling, 2005,8 ( 5 ) : 387 - 426. 被引量:1
  • 2Che A, Chu C. Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots [ J ]. European Journal of Operation Research,2009,199( 1 ) : 77-88. 被引量:1
  • 3Leung J,Zhang G. Optimal cyclic scheduling for printed-cir- cuit-board production lines with multiple hoists and general processing sequences [ J ]. IEEE Transactions on Robotics and Automation 2003,19 (3) : 480-484. 被引量:1
  • 4Lei L,Wang T J. A proof: the cyclic hoist Scheduling prob- lem is NP-hard [ R ]. New Jersey, USA : Rutgers University, 1989. 被引量:1
  • 5Chen H,Chu C,Proth J M. Cyclic scheduling of a hoist with time window constraints [ J ]. IEEE Transactions on Roboticsand Automation,1998,14( 1 ) : 144-152. 被引量:1
  • 6Yan P, Chu C, Yang N, et al. A branch and bound algorithm for Optimal Cyclic Scheduling in a Robotic Cell with Process- ing Time windows [ J ]. International Journal of Production Research,2010,48 (21) : 6461-6480. 被引量:1
  • 7李鹏,车阿大.基于混沌遗传算法的自动化生产单元调度方法[J].系统工程,2008,26(11):75-80. 被引量:14
  • 8Liu J, Jiang Y, Zhou Z. Cyclic scheduling of a single hoist in extended electroplating lines: a comprehensive integer pro- gramming solution [ J ]. IIE Transactions, 2002,34 ( 10 ) :905-914. 被引量:1
  • 9Che A, Chu C. Cyclic hoist scheduling in large real-life elec- troplating lines [ J]. OR Spectrum,2007,29(3): 445-470. 被引量:1
  • 10Lei L, Liu Q. Optimal cyclic scheduling of a robotic pro- cessing line with two-product and time-window constraints [JJ. INFOR,2001,39(2) : 185-199. 被引量:1

二级参考文献12

  • 1Dawande M,Geismar H N,Sethi S P, Sriskandarajah C. Sequencing and scheduling in robotic cells: recent developments[J].Journal of Scheduling, 2005,8 (5) 387- 426. 被引量:1
  • 2Phillips L W,Unger P S. Mathematical programming solution of a hoist scheduling program [J]. AIIE Transactions, 1976,8 (2) : 219 - 225. 被引量:1
  • 3Lei L, Wang T J. A proof: the cyclic hoist scheduling problem is NP-hard [Z]. Rutgers University, 1989. 被引量:1
  • 4Shapiro G W, Nuttle H W. Hoist scheduling for a PCB electroplating facility [J]. IIE Transactions, 1988,20(2) : 157-167. 被引量:1
  • 5Lei L, Wang T J. Determining optimal cyclic hoist schedules in a single-hoist electroplating line[J].IIE Transactions, 1994,26 (2) : 25-33. 被引量:1
  • 6Chen H, Chu C, Proth J M. Cyclic scheduling of a hoist with time window constraints[J]. IEEE Transactions on Robotics and Automation, 1998, 14 (1) : 144-152. 被引量:1
  • 7Liu J, Jiang Y, Zhou Z. Cyclic scheduling of a single hoist in extended electroplating lines: a comprehensive integer programming solution[J], IIE Transactions, 2002,34 : 905-914. 被引量:1
  • 8Che A D, Chu C B. Cyclic hoist scheduling in large real-life electroplating lines[J].OR Spectrum,2007, 29(3) : 445-470. 被引量:1
  • 9Levner E, Kats V, Levit V E. An improved algorithm for cyclic scheduling in a robotic cell[J].European Journal of Operational Research, 1997, 97(3) :500-508. 被引量:1
  • 10Manier M A. Contribution a I' ordonnancement cyclique du system de manutention d’ une ligne de galvanoplastie[D]. Universite de Franche-Comte, 1994. 被引量:1

共引文献13

同被引文献52

  • 1何桢,齐二石,王恒毅,韩尚梅.成组流水线上零件排序的优化算法[J].管理工程学报,1996,10(4):243-248. 被引量:7
  • 2周峰,沈月静,刘桂玲.加工装配型生产过程时间组织与工序优化研究[J].武汉科技大学学报,2006,29(6):620-623. 被引量:8
  • 3车阿大,晏鹏宇,杨乃定.复杂无等待自动化制造系统的调度算法研究[J].计算机集成制造系统,2007,13(8):1616-1623. 被引量:10
  • 4Dawande M W, Geismar H N, Sethi S P, et al. Sequencing and scheduling in robotic cells: recent developments [ J ]. Journal of Scheduling, 2005, 8(5) : 387-426. 被引量:1
  • 5Dawande M W, Geismar H N, Sethi S P, et al. Throughput optimization in robotic cells [ M ]. Germany : Springer, 2007 : 1-413. 被引量:1
  • 6Nowicki E, Smutnicki C. A fast tabu search algorithm for the job shop problem [ J ]. Management Science, 1996,42 ( 6 ) : 797-813. 被引量:1
  • 7Akturk M S, Guhekin H, Karasan O E. Robotic cell sched- uling with operational flexibility[ J]. Discrete Applied Mathematics, 2005, 145(3) :334-48. 被引量:1
  • 8Gultekin H, Karasan O E, Akyurk M S. Pure cycles in flexible robotic cells [J]. Computers & Operations Research, 2009, 36(2): 329-343. 被引量:1
  • 9Gultekin H, Akturk M S, Karasan 0 E. Scheduling in a three-machine robotic flexible manufacturing cell [ J ]. Computers & Operations Research, 2007, 34(8):2463-2477. 被引量:1
  • 10Hurink J, Knust S. A tabu search algorithm for scheduling a single robot in a job-shop environment[J]. Discrete Applied Mathematics, 2002,119 ( 1- 2) : 181- 203. 被引量:1

引证文献6

二级引证文献41

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部