针对卡拉、杨房沟水电站对外专用公路建设环境差、设计主线远离现有道路、进场便道需横跨雅砻江的实际情况,经深入研究,采用了缆索起重机,缩短了工期,节约了成本。
In view of the situations that the construction environment of access road from the KaLyangfanggou hydropower project is poor,the designed main route is far away from the existing roads,and the access sidewalk has to cross the Yalong River,the design with cable crane is adopted after in-depth study,which shortens construction period and saves cost.