期刊文献+

缆索吊机承载索几何非线性计算方法 被引量:1

Geometric Nonlinear Calculation Method of Loading Cable in Cable-Crane System
原文传递
导出
摘要 缆索吊机的承载索是一根连续索结构,利用索—轮单元法来解决索力连续的问题。索—轮单元分正、倒两种,正索—轮单元模拟索鞍,倒索—轮模拟荷重跑车。介绍了索—轮单元滑移平衡方程的建立与求解方法,提出了利用2节点悬链线单元索端力柔性迭代计算结果来选取单元平衡方程求解的迭代初值的方法。编制计算程序进行了工程实例的分析,验证了计算方法的正确性与必要性。 The loading cables of cable-crane are continuous structure which can be modeled by cablewheel elements. There are two types of cable-wheel elments, in which normal cable-wheel element models the cable saddle and inverted cable-wheel element models the loading roadster. The methods of establishing and solving the slipping equilibrium equation of cable-wheel element are presented. A method based on the flexible ieration reuslts of the end force of the 2-nodes cantenary element is proposed to determine the initial iteration value of the element equilibrium equation. Calculation program is developed to analyze engineering examples. The correctness and necessity of the method are verified.
出处 《公路》 北大核心 2013年第4期26-30,共5页 Highway
基金 广西交通科技项目 项目编号2010109
关键词 缆索吊机 承载索 索轮单元 有限元 非线性 计算 cable-crane loading cable cable-wheel element finite element method (FEM) nonlinear calculation
  • 相关文献

参考文献11

二级参考文献46

共引文献100

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部