为满足焦家金矿6 000 t/d的出矿能力要求,寺庄车间积极开展了扩大生产能力的研究及实践,通过对原有系统的优化、新系统的建立,提高机械化作业水平,利用一年的时间,将寺庄车间的出矿能力由原有的200 t/d提高到800 t/d,生产能力得到了很大的提升,并为后续的扩大生产能力奠定了基础。
In order to meet the requirement of 6 000 t/d out-mining capacity in Jiaojia gold mine,Sizhuang workshop actively carry out the research and practice to expand production capacity,through optimization of the original system,establishment of new system,we improve the level of mechanization.Using one year time,the out-mining capacity of Sizhuang workshop increase from 200 t/d to 800 t/d.The production capacity has been greatly improved,and it laid foundation for later expanding production capacity.