摘要
昆钢2台130 m2烧结机承担着向2000 m3高炉提供烧结矿的任务。受多种因素影响,烧结矿产量、质量与2000 m3高炉的要求还有一定差距。通过技术改造和新技术应用,使130 m2烧结机的各项技术经济指标有了大幅度提高,取得了较好的效果。
Two 130 m2 sintering machines in KISC have the duty to supply sintered ore to 2000 m3 blast furnace.But the output and quality of sintered ore is affected by many factors,it cannot meet the full requirements of the 2000 m3 blast furnace.The technical and economic target of 130 m2 sintering machine is increased significantly through technical transformation and application of new technology.
出处
《云南冶金》
2011年第3期37-41,共5页
Yunnan Metallurgy
关键词
烧结
新技术
效果
sintering
new technique
effect