乌弄龙水电站水轮机设置筒形阀相关问题分析

Analysis of cylinder valve installation at Wunonglong hydropower station
下载PDF
导出
摘要 乌弄龙水电站在汛期时具有一定的泥沙含量,为有效地减少机组停机时导叶漏水量,减轻导水机构的空蚀和泥沙磨损,提高机组运行可靠性和灵活性,水轮机设置了筒形阀。文章就水轮机设置筒形阀后进水口快速闸门的设置、机组防飞逸措施、筒形阀液压系统的设置、厂房尺寸的调整等问题进行了深入探讨,可供其它工程参考。 The Wunonglong hydropower station has certain silt content in flood period.Cylinder valves are provided for turbines so as to reduce the water leakage in guide vane during shutdown of units,decrease cavitation and sand abrasion of distributors,and increase the operation reliability and flexibility of units.This paper deeply discusses the issues resulted from provision of cylinder valves and in respects of intake emergency gate installation,the anti-runaway measures of units,the provision of hydraulic system for cylinder valves,and the adjustment of powerhouse size,etc.,which can provide reference for the other projects.
出处 《西北水电》 2011年第3期69-72,共4页 Northwest Hydropower
关键词 筒形阀 快速闸门 防飞逸 液压系统 厂房尺寸 cylinder valve emergency gate anti-runaway hydraulic system powerhouse size
  • 相关文献

参考文献8

二级参考文献14

共引文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部