针对东山煤矿通风能力不足、进入深部开采瓦斯涌出量可能增大等问题,对矿井通风系统进行技术测定后,结合实际提出了矿井通风系统优化改造方案,该方案实施后获得成功,取得了巨大的经济效益和社会效益,有一定借鉴意义。
In view of the insufficient of ventilation capacity and the gas discharge maybe increase in deep mining,after determination of the mine ventilation system,the transformation plan of optimizing ventilation system of mine shaft was put forward combined with practice.The plan was implemented successfuly and achieved enormous economic efficiency and social benefit,it will give some guidance for similar projects.
出处
《中国矿山工程》
2011年第3期54-56,共3页
China Mine Engineering
关键词
通风系统
方案
优化
ventilation system
plan
optimization