4Hatzipantelis E, Murray A, Penman J. Comparing hidden Markov models with artificial neural network architectures for Condition Monitoring Applications[C]//Fourth International Conference on Artificial Neural Network. UK: Cambridge, 1995:369-374. 被引量:1
5Ko T J,Cho D W. A daptive modeling of the Milling Process and Application of a Neural Network for tool wear monitoring[J].International Journal of Advanced Manufacturing Technology,1996, 12(1):5-13. 被引量:1
6CAO X, JIANG P,ZHOU G. Facility health maintenance through SVR-driven degradation prediction[J].Intemational Journal of Materials and Product Technology,2008, 33(1):185-193. 被引量:1
7DAVID C Y,THANH C N, PETER H. Bayesian network model for reliability assessment of power systems[J].IEEE Trans. on Power Systems,1999,14(2):426-432. 被引量:1
8BOUDALI H, DUGAN J B.A discrete-time Bayesian network reliability modeling and analysis framework[J]. Reliability Engineering and System Safety,2005,87: 337-349. 被引量:1