摘要
某体育中心工程的体育馆和游泳馆屋盖采用多级提升施工技术。通过对提升系统的合理设计、施工过程的精确控制和整个施工过程的仿真分析,解决了多级提升的吊点设置及提升力控制的难题,确保了工程高质量完工。
Multi-step lifting technology was applied to the gymnasium and natatorium roof of the sports center. Lifting system reasonable design, construction accurate control measures and simulation analysis in the whole construction process, which can slove hanging points setting and lifting force control in the multi-step lifting and ensure high qualtity completion.
出处
《广州建筑》
2011年第2期21-26,共6页
GUANGZHOU ARCHITECTURE
关键词
多级提升技术
提升系统
施工控制
仿真分析
multi-step lifting technology
lifting system
construction control
simulation analysis