基于宽度柔性的连浇组批计划模型及算法 被引量:1

Model and Algorithm for Continuous Casting Batch Production Planning Based on Width Flexibility
下载PDF
导出
摘要 高效的利用连铸生产设备的能力是炼钢—连铸生产计划优化技术的主要目标。在描述了炼钢—连铸生产计划调度编制步骤的基础上,重点分析连铸计划编制中问题。针对未充分利用虚拟板坯区间宽度属性及炉次区间宽度因素,并同时考虑浇次中炉次间钢级限制、连浇规程、中间包使用寿命限制、浇铸宽度跳跃限制的条件,建立了连铸计划优化数学模型。根据模型的特点,以蚁群优化算法为基础,设计了双层蚁群优化求解算法,并采用实际生产数据对模型及算法的有效性进行了验证。 The goal of the optimal technology of steelmaking and continuous casting production planning is how to efficiently utilize the power of the continuous casting production equipment.The problem of continuous casting production planning was emphatically analyzed.Because Virtual slab had two important properties casting width which was an interval value and steel grade.Interaction between casting width and steel grade reacted on steelmaking and continuous-casting production planning,besides restriction of continuous code and life of tundish.Aiming at this problem,an optimal model was established.According to characteristic of the model,a two-layer algorithm based-on ant colony optimize algorithm was proposed.A group of really numeral computational results show that the model and algorithm is effective.
出处 《系统仿真学报》 CAS CSCD 北大核心 2011年第5期1054-1058,共5页 Journal of System Simulation
基金 国家自然科学基金重点项目(60534010) 高等学校学科创新引智计划(B08015)
关键词 连连浇 连浇计划 浇次 炉次 中间包 宽度区间 蚁群算法 continuous cast cast planning cast charge tundish width interval ant colony optimize algorithm
  • 相关文献

参考文献14

二级参考文献15

  • 1唐立新,杨自厚,王梦光.炼钢─连铸最优浇次(CAST)计划[J].东北大学学报(自然科学版),1996,17(5):554-558. 被引量:13
  • 2唐立新,杨自厚,王梦光.炼钢-连铸最优炉次计划模型与算法[J].东北大学学报(自然科学版),1996,17(4):440-445. 被引量:32
  • 3黄可为,卢克斌,汪定伟.炼钢组炉问题优化模型及其动态规划算法[J].东北大学学报(自然科学版),2006,27(2):138-141. 被引量:21
  • 4Harjunkoski I,Grossmann I E.A decomposition approach for the scheduling of a steel plant production[J].Computers and Chemical Engineering,2001,25(16):47-1660. 被引量:1
  • 5Craig I K,Camisani-Calzolari F R,Pistorius P C.A contemplative stance on the automation of continuous casting in steel processing[J].Control Engineering Practice,2001,9(9):1013-1020. 被引量:1
  • 6Smith A,Smith B.Constraint programming approaches to a scheduling problem in steelmaking[A].University of Leeds School of Computer Studies Research Report Series[C].Leeds:Leeds School Press,1997.1-10. 被引量:1
  • 7Tang L X,Liu J Y,Rong A Y,et al.A mathematical programming model for scheduling steelmaking-continuous casting production[J].European Journal of Operation Reseach,2000,120(2):423-435. 被引量:1
  • 8Pacciarelli D,Pranzo M.Production scheduling in a steelmaking-continuous casting plant[J].Computers and Chemical Engineer,2004,28(12):2823-2835. 被引量:1
  • 9Numao M,Morishita S.Cooperative scheduling and its application to steelmaking process[J].IEEE Tansactions on Industrial Electronics,1991,38(2):150-155. 被引量:1
  • 10Lee H S,Murthy S S,Haider S W,et al.Primary production scheduling at steelmaking industries[J].IBMJ Res Develop,1996,40(2):231-252. 被引量:1

共引文献50

同被引文献73

引证文献1

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部