摘要 性能风险是指在预定的资源条件(如费用和进度)下,研制系统从原有设计水平向较高性能设计水平演进过程中技术性能水平达不到预期要求所带来的风险。根据武器装备研制过程中各子系统活动的研制失败概率及相应的多反馈分支,建立图示评审技术随机网络仿真模型,通过设定仿真时钟实现对研制工期的约束。对仿真输出结果进行统计分析,建立在研制费用与研制工期约束下子系统级和项目级性能风险概率评估模型,分析项目级与子系统级性能风险概率分布之间的关系。最后,结合某武器装备研制项目给出详细的分析过程,并已验证仿真模型和风险评估模型的实用性和有效性。 Performance risk is usually defined as the risk that technical performance failed to achieve desired level under the scheduled resource conditions(such as cost and schedule).The failure probability and multi-branch feedback of activities within subsystems is brought in the graphical evaluation and review technique(GERT) network,and a feedback simulation model is established.The schedule constraints are achieved by setting the simulation clock TNOW.The assessment models of the performance risk probability of both subsystem level and project level are established under the cost and schedule constraints,also the relationship between the distributions of the performance risk probability of both the project level and the subsystem level is studied.The performance risk of a specific weapon system is analyzed,which proves the feasibility and effectiveness of the simulation model.
作者 徐哲 贾子君
出处 《系统工程与电子技术》 EI CSCD 北大核心 2011年第4期793-798,共6页 Systems Engineering and Electronics
基金 国家自然科学基金面上项目(70871004) 航空科技创新基金(07E51009)资助课题
关键词 风险评估 性能风险 图示评审技术 武器装备系统 risk assessment performance risk graphical evaluation and review technique weapon system
  • 相关文献

参考文献30

二级参考文献97

共引文献162

同被引文献29

  • 1徐哲,冯允成,鲁大伟.武器装备研制项目的技术风险评估[J].系统工程与电子技术,2005,27(6):1123-1127. 被引量:44
  • 2张汉鹏,邱菀华.复杂产品开发的多因素风险分析模型及仿真[J].计算机集成制造系统,2007,13(7):1295-1299. 被引量:6
  • 3刑昌风,李敏勇,吴玲.舰载武器系统效能分析[M].北京:国防工业出版社,2008. 被引量:18
  • 4田新广,邱志明,段洣毅.基于模糊综合评价模型的武器研制技术风险分析[J].指挥控制与仿真,2007,29(5):90-92. 被引量:7
  • 5Smith R P, Eppinger S D. A predictive model of sequential iteration in engineering design[J]. Management Science, 1997, 43 (8) : 1104 - 1120. 被引量:1
  • 6Browning T R, Eppinger S D. Modeling impacts of process ar- chitecture on cost and schedule risk in product development[J]. IEEE Trans. on Engineering Management, 2002, 49(4):428 - 443. 被引量:1
  • 7Eppinger S D. Innovation at the speed of information[J]. Har- vard Business Review, 2001, 79(1) : 149 - 158. 被引量:1
  • 8Steward D V. The design structure system: a method for man- aging the design of complex systems]-J]. IEEE Trans. on Engi- neering Management, 1981, 28(3): 71-74. 被引量:1
  • 9Eppinger S D, Whitney D E, Smith R P, et al. A model-based method for organizing tasks in product development[J]. Re- search in Engineering Design, 1994, 6(1): 1 - 13. 被引量:1
  • 10Abdelsalam H, Bao H. A simulation-based optimization frame- work for product development cycle time reduction[J]. IEEE Trans. on Engineering Management, 2006, 53(1) : 69 - 85. 被引量:1

引证文献2

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部