期刊文献+

内蒙古某风机基础地基处理的对比分析 被引量:2

Comparative analysis on ground treatment of the air blower in Inner Mongolia
下载PDF
导出
摘要 针对风力发电机组的特殊性和对地基基础的稳定性要求,结合工程实践、材料来源和综合经济性,利用两种换填法对地基基础进行了处理,通过对比选择得出了更合适此风电场的地基处理方案。 In view of the specialty of the wind power generators and its special requirement for ground stability, combining with engineering case, materials source, and comprehensive economy, it carries on treatment for ground by using two calculation methods, and obtains more suitable ground treatment scheme of wind farms by comparative selection.
作者 王岩峰
出处 《山西建筑》 2011年第7期50-51,共2页 Shanxi Architecture
关键词 风机基础 地基处理 换填法 air blower foundation, ground treatment, replacement method
  • 相关文献

参考文献4

二级参考文献7

  • 1张殿生.电力工程高压送电线路设计手册[M].长春:国家电力公司东北电力设计院,2002. 被引量:3
  • 2FD 003-2007风电机组地基基础设计规范(试行)[S]. 被引量:2
  • 3Ukritchon B,Whittle A J,Sloan S W.Undrained limit analyses for combined loading of strip footings on clay[J].Journal of C,eetechnical and Geoenvironmental Engineering,ASCE,1998,124(3):265-276. 被引量:1
  • 4陈观福.地震作用对风力发电机组塔架地基基础设计的影响分析[R].中国风电研究报告,2008:231-237. 被引量:1
  • 5GB5007-2002.建筑地基基础设计规范[S].[S].,.. 被引量:157
  • 6栾茂田 金崇磐 林皋.非均质地基上浅基础的极限承载力.岩土工程学报,1988,10(4):14-27. 被引量:19
  • 7王民浩,陈观福.我国风力发电机组地基基础设计[J].水力发电,2008,34(11):88-91. 被引量:52

共引文献1798

同被引文献3

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部