摘要
刘集地涵工程已建成18 a,从目前运行情况来看,该工程存在的重大问题不多,但主体工程大多位于地下,不易观测。采用水工结构有限元计算软件(Autobank5.6),计算得出刘集地涵洞身受力情况,从而对洞身配筋进行复核,得出各构件强度均能满足要求的结论,为管理单位提供依据。
Liuji underground culvert engineering has worked for 18 years. The project has no significant problems from current operating conditions, but because most of the principal part of the project is located in underground, it is difficult to be observed. The finite element software (Autobank 5.6) is adopted to work out the force conditon of Liuji underground culvert, and recheck for reinforcement of the culvert body. The conclusion is achieved that each component could meet the requirements, which could provide bases for management units.
出处
《水利与建筑工程学报》
2010年第6期147-149,共3页
Journal of Water Resources and Architectural Engineering