拱坝基础处理中的传力洞设计 被引量:3

Design of concrete plug in foundation treatment of arc dams
下载PDF
导出
摘要 为了改进拱坝传力洞的设计方法,寻求传力洞设计的理论依据,提出了传力洞的预期压缩变形量与拱坝的拱端位移相一致的设计原则.将围岩对传力洞的影响简化为抗力作用,并利用最小势能原理,导出求解传力洞截面尺寸的理论公式.结果表明:传力洞顶端推力与洞顶位移之间的关系表现为线性,该线性关系的斜率表达式中包含有传力洞的面积变量;据此关系式,可以求出传力洞的截面积. For improving the design methods for concrete plugs of arch dams and seeking for the theoretical basis for their design,a design discipline was proposed,that is,the displacement of the dam abutment should be equal to the compression of the concrete plugs.The influences of the surrounding rock on the concrete plugs were simplified to the action of resistance,and the formulas to solve the sectional size of the concrete plugs were derived according to the principles of the minimum potential energy.The results show that the relationship between the thrust and the displacement on the top of the concrete plugs is linear,and the sectional area of the concrete plugs is included in the gradient of the relationship.By use of the relationship,the sectional area of the concrete plugs can be obtained.
出处 《河海大学学报(自然科学版)》 CAS CSCD 北大核心 2010年第6期711-715,共5页 Journal of Hohai University(Natural Sciences)
基金 国家自然科学基金(50579081)
关键词 拱坝 地基处理 传力洞 断层破碎带 有限元分析 arc dam foundation treatment concrete plug fractured zone in fault finite element analysis
  • 相关文献

参考文献12

二级参考文献62

共引文献111

同被引文献16

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部