上海轨道交通11号线盾构隧道损坏调查及修复 被引量:9

A Study of Damage Investigation & Rehabilitation of Shanghai Metro Line 11 Shield Tunnel
下载PDF
导出
摘要 上海轨道交通11号线安亭支线区间隧道被京沪高铁工程施工临时PC桩击穿,致使该段区间上、下行线隧道管片均出现严重破损。对事故场地工程地质条件、管片损伤程度、工期等影响因素作具体分析后,提出了针对下行线区间隧道的"局部加固、局部替换"和针对上行线区间隧道的"冻结加固暗挖修复"的原位修复方案。实施结果证明修复效果良好。 The temporary PC piles in express railway line project between Beijing and Shanghai were accidentally driven into the interval tunnels of branch line of Shanghai Metro Line 11 in Anting. And so the lining of the interval tunnels were badly damaged. Based on the analysis of the geological condition, extent of damage, construction time limit and etc., two rehabilitation programs in original tunnel position are suggested. One is "local reinforcement and local replacement" for left line, and the other is "subsurface excavation method after freezing" for right line. And the two rehabilitation programs are proved to be effective by practice.
作者 沈国红
出处 《中国市政工程》 2010年第5期29-31,共3页 China Municipal Engineering
关键词 上海市轨道交通11号线 隧道损坏 原位修复 冻结加固 暗挖 Shanghai Metro Line 11 damage of tunnels rehabilitation in original position reinforcement by freezing subsurface excavation method
  • 相关文献

同被引文献121

引证文献9

二级引证文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部