摘要
针对神木县城供水工程基本情况,对竖井施工中遇到的问题以及冻结法在竖井施工中的应用做了介绍,同时提出了采用冻结法堵水方案,解决了竖井穿越深层流砂段施工难题。
Focusing on the basic situation of supplying water project on Shenmu country,it introduces the problems during the shaft well construction and the application of freezing method on shaft well construction.At the same time,it proposals to adopt the water plugging with freezing method to solve the construction difficulty of shaft well crossing the quicksand from deep layer.
出处
《山西建筑》
2010年第27期150-151,共2页
Shanxi Architecture
关键词
供水
竖井
冻结法
water supplying
shaft well
the freezing method