摘要
通过对比试验对冬季低温(8~12℃)奈件下A^2/O和A^2/O挂膜工艺的启动进行了研究。启动阶段COD/NH3-N较低(33~7.2)。采用接种污泥间歇培养法驯化污泥7d,然后连续进水运行20d后,A^2/O和A2/O挂膜反应器对COD及NH3-N去除率分别为60%和70%以上,表明反应器启动过程完成。
This tests by comparing the low temperature in winter (8-12 ℃) under the A2/O and A2/O process linked to membrane was studied. COD/NH3-N lower start-up phase (3.3-7.2). Batch culture inoculated with acclimated sludge 7 d, then run straight water after 20d, A2/O and A2/O hanging membrane reactor, COD and NH3-N removal rates were respectively above 600 and 70%, indicating that reactor startup process is complete.
出处
《中国资源综合利用》
2010年第8期26-28,共3页
China Resources Comprehensive Utilization