摘要
本文在考虑施工方法和施工过程的基础上,对预应力混凝土连续箱梁桥的施工状态和成桥状态进行详细地分析和验算,从而在确保桥梁结构施工安全的基础上同时保证桥梁结构成桥安全,在设计与施工相互协调的基础上,使桥梁的施工状态和成桥状态均满足规范要求。
Considering the construction method and stages,the prestressed concrete continuous girder bridge is analyzed and checked in construction and completion status of the bridge detailedly,whose construction method is the balanced cantilever construction.Then the completion status safety can be guaranteed based on the construction safety of the bridge so that the specification requirements can be attained in the construction and completion status of the bridge.
出处
《福建建筑》
2010年第7期41-42,49,共3页
Fujian Architecture & Construction
关键词
预应力混凝土连续梁桥
施工阶段
成桥状态
分析
验算
Prestressed concrete continuous girder bridge Construction stage Completion status of bridge Analysis Check