摘要
通过某高速公路满堂支架现浇箱梁的施工案例分析,对满堂支架现浇施工技术进行总结,可为今后解决满堂支架现浇施工中的重、难点问题提供很好的借鉴。
Through a case study on the construction of cast-in-place box girder with full framing of a expressway, the technologies of cast-in-place construction with full framing are summarized, which provides reference for the solution to emphasis and difficulties exiting in cast-in-place construction of full framing in future.
出处
《交通标准化》
2009年第17期244-246,共3页
Communications Standardization
关键词
高速公路
箱梁
现浇
满堂支架
expressway
box girder
cast-in-place
full framing