随着青海油田开发的不断深入,油田开发逐步走向精细化,在开发过程中不断采用先进的采油工艺技术成为油田开发的主旋律。堵水酸化一体管柱技术通过一趟管柱在完成对油井出水层的封堵的同时能够对产油层进行分层酸化,不但减少了施工强度、降低了作业费用而且能够缩短油井投产时间。
Along with the Qing Hai oil field development of continuously thorough,the oil field development heads for gradually the fine turns, adopting continuously in develop process the advanced oil extraction craft technique become the main melody that oil field develop.The water shut off is sour to turn the integral whole pipe string technique pass a pipe string to block up at the same time to can proceed the zonation the sour turning to the oil pay at the that complete to the oil well a water bed,not only reduced the construction strength,lowered the homework expenses but also can shorten the oil well hurl produce time.
出处
《内蒙古石油化工》
CAS
2010年第10期120-121,共2页
Inner Mongolia Petrochemical Industry
关键词
堵水
酸化
一体管柱
油井
采油工艺
Water shut off
Acidification
Integrative pipe string
Oil well
Oil extraction craft