摘要
通过对水泥工程的类型、组成、占地以及施工和生产工艺、土石方量及弃渣的分析,总结出水泥工程在建设与生产过程中的水土流失特点,水泥工程在建设期间的水土流失重点区域是厂区,而在生产运行期则是石灰石和黏土矿,此外在水泥生产厂区还会产生大量的粉尘。水泥工程除了应遵循"生产建设项目水土保持准入条件通用条款"中的条件外,对照涉及水泥产业的法律、法规、规范、政策、标准、发展纲要和行业发展规划,提出了水泥工程项目的否决、限批和缓批的13条水土保持准入条件。根据水土保持新国标和有关法规的规定,结合典型案例分析,提出须修正主体设计的5项准入条件和须修改水土保持方案的4项准入条件。
Based on the analysis of types,components,land occupation,production technology,earthwork and waste involved in cement inductry projects,the characteristics of soil erosion and water loss during the construction and manufacturing procedure of cement works are shown.Soil erosion and water loss mainly occur during the construction of cement works while during production,it is mainly the exploitation of lime and clay and the dust released in the factory.According to the "universal items of the permitted requirements of soil and water conservation for construction and production projects" in reference to the related laws,rules,regulations,policies,codes,development guidelines and industry development program in cement industry,13 items of permitted requirements of soil and water conservation are put forward in this research for rejection,restricted approval and delayed approval of cement industry projects.On the basis of related laws and regulations and the new national code for soil and water conservation and in light of analysis of typical cases,5 items of permitted requirements are put forward in this research that required the revision of the main-building design,and 4 items that required the revision of the soil and water conservation plan.
出处
《中国水土保持科学》
CSCD
2010年第3期104-107,共4页
Science of Soil and Water Conservation
基金
国家财政部
水利部2008专题"开发建设项目水土保持准入条件研究"(1260816153)
关键词
水泥工业
水土保持
准入条件
工业项目
水土保持方案
cement industry
soil and water conservation
permitted requirement
industry project
soil and water conservation plan