期刊文献+

基于权变多维动态特征分析方法的NOKIA通信设备工程项目风险管理研究 被引量:6

Research on the Risk Management of the NOKIA Communication Equipment Engineering Based on Multidimensional Dynamic Characteristic Risk Analysis Method
下载PDF
导出
摘要 针对NOKIA通信设备工程项目的工艺流程和特点,运用权变多维动态特征分析方法研究和分析了NOKIA通信设备工程项目的风险识别,并对潜在的风险因素进行了分析评价和风险等级排序,提出了解决风险的对策。初步解决了NOKIA通信设备工程项目的实际问题。 Based on the analysis of the characteristics of the NOKIA communication equipment engineering project,it researches the risk identification of the NOKIA communication equipment engineering project and analyzes potential risk factors and risk rank by using multidimensional dynamic characteristic risk analysis method.It proposes countermeasures to solve risks and initially solves the practical problems in the project.
作者 王长峰 何涛
出处 《软科学》 CSSCI 北大核心 2010年第6期51-57,共7页 Soft Science
基金 国家自然科学基金项目(70972123) 教育部人文社科规划基金项目(09YJA630011) 国防科工委"十五"重点基金项目(2072003A001)
关键词 权变多维动态特征分析方法 NOKIA通信设备 工程项目 风险管理 multidimensional dynamic characteristic risk analysis method the NOKIA communication equipment engineering project risk management
  • 相关文献

参考文献13

  • 1蔡晨,王长峰等.舰船建造过程风险识别与分析实施[R].2004.28-44. 被引量:1
  • 2王长峰..重大研发(R&D)项目过程管理综合集成与过程风险管理模式研究[D].中国科学技术大学,2004:
  • 3Sheng - Yung Chang, Chuei - Tin Chang. A Fuzzy - logic Based Fault Diagnosis Strategy for Process Control loops [ J ]. Chemical Engineering Science ,2003 (58) : 3395 - 3411. 被引量:1
  • 4Stephen Ward, Chris Chapman. Transforming Project Risk Management into Project Uncertainty Management [ J ]. International Journal of Project Management,2003 (21) :97 - 105. 被引量:1
  • 5P N Sharratt, P M Choong. A Life - Cycle Framework to Analyse Business Risk in Process Industry Projects [ J ]. Journal of Cleaner Production,2002(10) : 479 - 493. 被引量:1
  • 6James Jiang, Gary Klein. Software Development Risks to Project Effectiveness[ J ]. The Journal of Systems and Software, 2005 (52) :3 -10. 被引量:1
  • 7Michael E, Kraft A. Myrick Freeman Introduction:Economic and Political Issues in Risk Anaiysis[ J]. Risk Analysis, 2005 (3) :278 -281. 被引量:1
  • 8Katrina R, Hampton P E. An Integrated Risk Analysis Methodology in a Multidisciplinary Design Environment[ D]. 2003. 128 -130. 被引量:1
  • 9孙毅.通信工程项目风险评估[J].项目管理技术,2008,6(12):34-37. 被引量:5
  • 10宾友福..移动通信工程项目风险管理研究[D].天津大学,2007:

二级参考文献5

共引文献25

同被引文献22

引证文献6

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部