摘要
以云南水麻高速滴水岩大桥现浇T梁形成桥上预制场施工为例,结合工程特点,分别阐述了施工场地布置、搭架现浇T梁施工及其模板支架的计算,T梁的横移安装三方面的具体步骤和注意事项,为山区桥梁无预制场情况下施工积累了经验。
Taking the cast-in-place T-beam construction on Dishuiyan Bridge along Yunnan Shuima expressway as an example,the paper combining with the project characteristics,illustrates the construction field layout,the establishment of cast-in-place T-beam construction and the calculation of the model support,and the traverse installation of T-beam and precautions,so as to accumulate experience for the construction in no cast-in-place field of mountainous regions.
出处
《山西建筑》
2010年第16期286-287,共2页
Shanxi Architecture
关键词
现浇T梁
支架
预制场
台座
cast-in-place T-beam
support
cast-in-place field
pedestal